scaffold access requirements

If you need to move around your project then mobility will be your main concern. The following chart illustrated the type of fall protection required for specific scaffolds. Scaffolds and scaffold components shall be inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity. Vertical lifelines, independent support lines, and suspension ropes shall not be attached to each other, nor shall they be attached to or use the same point of anchorage, nor shall they be attached to the same point on the scaffold or personal fall arrest system. This determination shall be based on site conditions and the type of scaffold being erected or dismantled. A study of the degradation properties of Guardrail systems are explained below in another question. Safe points of anchorage include structural members of buildings, but do not include standpipes, vents, other piping systems, electrical conduit, outrigger beams, or counterweights. Work on or from scaffolds is prohibited during storms or high winds unless a competent person has determined that it is safe for employees to be on the scaffold and those employees are protected by a personal fall arrest system or wind screens. [29 CFR 1926.451(g)(3)(iii) and 29 CFR 1926.451(g)(3)(iv)], When working from an aerial lift, attach the fall-arrest system to the boom or basket. [, When outrigger scaffolds are 3 inches (8 cm) or less from the front edge. When acids or other corrosive substances are used on a scaffold, the ropes shall be shielded, treated to protect against the corrosive substances, or shall be of a material that will not be damaged by the substance being used. [, When employees are plastering and lathing 18 inches (46 cm) or less from the front edge. Suspension ropes supporting adjustable suspension scaffolds shall be of a diameter large enough to provide sufficient surface area for the functioning of brake and hoist mechanisms. Stair-rails and handrails must be designed and constructed to prevent punctures, lacerations, snagged clothing, and projection. Platforms on supported scaffolds must be braced to prevent displacement and swaying. c) Added guidance for assessing base soil conditions. Unsafe scaffolding has the potential to result How wide does the work area need to be on scaffolding? Must have slip-resistant treads on all steps and landings. Guardrail height. When winding drum hoists are used on a suspension scaffold, they shall contain not less than four wraps of the suspension rope at the lowest point of scaffold travel. Handrails, and toprails that serve as handrails, shall provide an adequate handhold for employees grasping them to avoid falling. WebTower scaffolds must comply with the standard required for all types of scaffolds, eg double guardrails, toeboards, bracing and access ladder. Toeboards shall be solid or with openings not over one inch (2.5 cm) in the greatest dimension. [, All support devices must rest on surfaces capable of supporting at least four times the load imposed on them by the scaffold when operating at the rated load of the hoist, or at least one-and-a-half times the load imposed on them by the scaffold at the stall capacity of the hoist, whichever is greater. Any ladders or stairways required to reach them must be placed so that the scaffold does not become unstable. When Scaffolding is Needed The very short answer is: when a risk assessment outlines it is necessary! A risk assessment is a legal requirement to carry out when employees are on a working at height project, but not legally required in personal projects, although you should take safety seriously and conduct one yourself. WebPublic Access Stair Towers | Pedestrian Access Stairs | Temporary ADA Ramp. WebDetermines that each scaffold and scaffold component shall be capable of supporting, without failure, its own weight and at least 4 times the maximum intended load applied or Climbing the structural cross-braces of a scaffold is unsafe, and specifically forbidden by federal standards. Excess suspension wire rope and any additional independent lines from grounding shall be insulated; The suspension wire rope shall be covered with insulating material extending at least 4 feet (1.2 m) above the hoist. [29 CFR 1926 Subpart L Appendix A(1)(b) & (c)]. Have a maximum spacing between rungs of 16 3/4 inches (43 cm). [, A competent person must evaluate all direct connections prior to use to confirm that the supporting surfaces are able to support the imposed load. Must be at least 18 inches wide between stair-rails, and have a landing platform at least 18 inches wide by at least 18 inches long at each level. Counterweights shall be secured by mechanical means to the outrigger beams to prevent accidental displacement. Suspension scaffold outrigger beams, when used, shall be made of structural metal or equivalent strength material, and shall be restrained to prevent movement. What are the requirements for scaffold planking? Mobile Some Fall arrest systems should protect these employees. Steel or plastic banding shall not be used as a toprail or midrail. Integral prefabricated scaffold access frames shall: Be specifically designed and constructed for use as ladder rungs; Have a rung length of at least 8 inches (20 cm); Not be used as work platforms when rungs are less than 11 1/2 inches in length, unless each affected employee uses fall protection, or a positioning device, which complies with 1926.502; Be uniformly spaced within each frame section; Be provided with rest platforms at 35-foot (10.7 m) maximum vertical intervals on all supported scaffolds more than 35 feet (10.7 m) high; and. May forklifts, front-end loaders, or similar equipment support platforms? NOTE: As of January 1, 1998, subpart M of this part provides that body belts are not acceptable as part of a personal fall arrest system. What are the footing and foundation requirements for supported scaffolds? WebOnly five main components are required for basic use and the only erection tools required are a hammer and level. [, All suspension scaffolds must be tied or otherwise secured to prevent them from swaying, as determined by a competent person. Greater variations in riser height are allowed for the top and bottom steps of the entire system, not for each flight of stairs. [29 CFR 1926.451(d)(3)(ii) and 29 CFR 1926.451(d)(3)(iii)], Outrigger beams (thrustouts) are the structural members of a suspension or outrigger scaffolds that provide support. Do employees working on supported scaffolds need to be trained? [, When lanyards are connected to horizontal lifelines or structural members on single-point or two-point adjustable scaffolds, the scaffold must have additional independent support lines equal in number and strength to the suspension lines and have automatic locking devices. A landing platform at least 18 inches (45.7 cm) wide by at least 18 inches (45.7 cm) long shall be provided at each level. Scaffold components manufactured by different manufacturers shall not be modified in order to intermix them unless a competent person determines the resulting scaffold is structurally sound. Scaffold planking must be able to support, without failure, its own weight and at least four times the intended load. Crossbracing is acceptable in place of a midrail when the crossing point of two braces is between 20 inches (0.5 m) and 30 inches (0.8 m) above the work platform or as a toprail when the crossing point of two braces is between 38 inches (0.97 m) and 48 inches (1.3 m) above the work platform. If there is a tail line below the hoist, it shall be insulated to prevent contact with the platform. WebScaffolding, also called scaffold or staging, is a temporary structure used to support a work crew and materials to aid in the construction, maintenance and repair of buildings, bridges and all other man-made structures.Scaffolds are widely used on site to get access to heights and areas that would be otherwise hard to get to. Hook-on or attachable ladders shall be installed as soon as scaffold erection has progressed to a point that permits safe installation and use. Crossbraces shall not be used as a means of access. Scaffolds shall be designed by a qualified person and shall be constructed and loaded in accordance with that design. Handrails, and toprails that are used as handrails, shall be at least 3 inches (7.6 cm) from other objects. WebScaffolding Access Requirements 9 out of 10 based on 159 ratings. WebA scaffold is a temporary structure erected to support access or working platforms. In addition to wearing hardhats each employee on a scaffold shall be provided with additional protection from falling hand tools, debris, and other small objects through the installation of toeboards, screens, or guardrail systems, or through the erection of debris nets, catch platforms, or canopy structures that contain or deflect the falling objects. [29 CFR 1926.451(d)(15)], An automatic braking and locking device, in addition to the operating brake, must engage when a hoist makes instantaneous change in momentum or an accelerated overspeed. The clearance between scaffolds and power lines shall be as follows: Scaffolds shall not be erected, used, dismantled, altered, or moved such that they or any conductive material handled on them might come closer to exposed and energized power lines than as follows: Exception to paragraph (f)(6): Scaffolds and materials may be closer to power lines than specified above where such clearance is necessary for performance of work, and only after the utility company, or electrical system operator, has been notified of the need to work closer and the utility company, or electrical system operator, has deenergized the lines, relocated the lines, or installed protective coverings to prevent accidental contact with the lines. Exception to paragraph (b)(1): The requirement in paragraph (b)(1) to provide full planking or decking does not apply to platforms used solely as walkways or solely by employees performing scaffold erection or dismantling. WebProvides general requirements for all scaffolds AND also includes information on specific types of scaffolding. What are the access requirements for employees erecting and dismantling supported scaffolds? The ladder legs shall be secured to prevent them from slipping or being pushed off the platform. [29 CFR 1926.451(a)(5)], The stall load is the load at which the prime-mover (motor or engine) of a power-operated hoist stalls or the power to the prime-mover is automatically disconnected. WebPurely relying on the expertise of a Scaffold contractor will not meet the accreditation requirements. Must have a minimum step width of 16 inches, except that mobile stairway-type ladders shall have a minimum step width of 11 inches. What are scaffold platform construction requirements? If the slope of a ramp or a walkway is steeper than one (1) vertical in eight (8) horizontal, the ramp or walkway shall have cleats not more than fourteen (14) inches (35 cm) apart which are securely fastened to the planks to provide footing. [29 CFR 1926.451(a)(6)] Scaffolds and scaffold components must not be loaded in excess of their maximum intended loads or rated capacities, whichever is less. [29 CFR 1926.453(b)(2)(v)]. Must be specifically designed for the type of scaffold with which they are used. Evidence that the secondary brake has been activated during an overspeed condition and has engaged the suspension rope. [29 CFR 1926.451(f)(16)], The standard prohibits work on platforms cluttered with debris. When do supported scaffolds need to be restrained from tipping? Such materials cannot be used as counterweights. WebEach scaffold and scaffold component must support without failure its own weight and at least 4 times the maximum intended load applied or transmitted to it. Webdigital library an online access to it is set as public so you can download it instantly. [, A competent person must inspect ropes for defects prior to each workshift and after every occurrence that could affect a rope's integrity. When the loads specified in paragraph (g)(4)(vii) of this section are applied in a downward direction, the top edge shall not drop below the height above the platform surface that is prescribed in paragraph (g)(4)(ii) of this section. Wire suspension ropes shall not be joined together except through the use of eye splice thimbles connected with shackles or coverplates and bolts. The independent support lines shall be equal in number and strength to the suspension ropes. Such activities shall be performed only by experienced and trained employees selected for such work by the competent person. [29 CFR 1926.451(b)(1)], Scaffold planking must be able to support, without failure, its own weight and at least four times the intended load. Scaffolding is the solution to many access issues, providing a safe and legal means of access for workers at height. It is recommended above many other means of access, especially if the work will be prolonged or involve multiple workers, tools, equipment or materials. Manila or plastic (or other synthetic) rope being used for toprails or midrails shall be inspected by a competent person as frequently as necessary to ensure that it continues to meet the strength requirements of paragraph (g) of this section. Effective September 2, 1997, the employer shall have a competent person determine the feasibility and safety of providing fall protection for employees erecting or dismantling supported scaffolds. Devices whose sole function is to provide emergency escape and rescue shall not be used as working platforms. The toprail of each stairrail system shall also be capable of serving as a handrail, unless a separate handrail is provided. [29 CFR 1926.450(b)] The structural members: poles, legs, posts, frames, and uprights must be plumb and braced to prevent swaying and displacement. All suspension scaffold support devices, such as outrigger beams, cornice hooks, parapet clamps, and similar devices, shall rest on surfaces capable of supporting at least 4 times the load imposed on them by the scaffold operating at the rated load of the hoist (or at least 1.5 times the load imposed on them by the scaffold at the stall capacity of the hoist, whichever is greater). Two tie-backs installed at opposing angles are required when a perpendicular tieback cannot be installed. Note to paragraph (g)(1): The fall protection requirements for employees installing suspension scaffold support systems on floors, roofs, and other elevated surfaces are set forth in subpart M of this part. [29 CFR 1926.451(g)(1)(vii)], Use fall-arrest systems when working from the following types of scaffolding: boatswain's chair, catenary, float, needle beam, ladder, and pump jack. What are the requirements for work on platforms cluttered with debris? For all scaffolds not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, each employee shall be protected by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section. Scaffolding Access Egress Requirements. Are there specific requirements for outrigger beams? Zelienople, PA 16063. Horizontally - at each end; at intervals not to exceed 30 feet (9.1 m) from one end. Personal fall-arrest systems include harnesses, components of the harness/belt such as D-rings, and snap hooks, lifelines, and anchorage points. Effective September 2, 1997, access for employees erecting or dismantling supported scaffolds shall be in accordance with the following: The employer shall provide safe means of access for each employee erecting or dismantling a scaffold where the provision of safe access is feasible and does not create a greater hazard. How to reduce the risk of injury when using bakers scaffolds WebEach scaffolding access ladder section, whether 6ft or 3ft requires a ladder bracket. [29 CFR 1926.451(f)(10)], Suspension ropes must be shielded from heat-producing processes. The scaffolding standard prohibits the The space must not exceed 9 inches (24.1 cm) when side brackets or odd-shaped structures result in a wider opening between the platform and the uprights. [29 CFR 1926.451(g)(3)(i)], No. "Access." [, Guardrails, a personal fall-arrest system, or both must protect each employee more than 10 feet (3.1 m) above a lower level from falling. When conditions warrant, the height of the top edge may exceed the 45-inch height, provided the guardrail system meets all other criteria of paragraph (g)(4). [29 CFR 1926.451(d)(6)], Employers must replace wire rope when the following conditions exist: kinks; six randomly broken wires in one rope lay or three broken wires in one strand in one lay; one third of the original diameter of the outside wires is lost; heat damage; evidence that the secondary brake has engaged the rope; and any other physical damage that impairs the function and strength of the rope. Ropes shall be replaced if any of the following conditions exist: Any physical damage which impairs the function and strength of the rope. Must have a maximum space between rungs of 16 inches. [29 CFR 1926.451(d)(13)], The stall load of any scaffold hoist must not exceed three times its rated load. The training must include fall hazards, falling object hazards, electrical hazards, proper use of the scaffold, and handling of materials. [29 CFR 1926.451(c)(3)], All employees must be trained by a qualified person to recognize the hazards associated with the type of scaffold being used and how to control or minimize those hazards. Our Office Location. Non-uniform rung spacing caused by joining end frames together is allowed, provided the resulting spacing does not exceed 16 3/4 inches (43 cm). Scaffolds are commonly used in construction work so workers have a safe, stable work The first section of scaffold must have two ladder brackets and each subsequent section above needs one bracket. WORKERS MUST USE FALL PROTECTION WHEN WORKING FROM THIS SCAFFOLD Green: SCAFFOLD IS OK FOR USE Tag must include the scaffold capacity: Are guardrails required on all open sides of scaffolding? The stall load of any scaffold hoist shall not exceed 3 times its rated load. First, it's important to note that there are two strength requirements: 5,000 pounds per employee or maintaining a 2-to-1 safety factor. Can sand, masonry units, or rolls of roofing felt be used for counterweights? Some of the requirements for all types of suspension scaffolds include: Counterweights used to balance adjustable suspension scaffolds must be able to resist at least four times the tipping moment imposed by the scaffold operating at either the rated load of the hoist, or one-and-a-half (minimum) times the tipping moment imposed by the scaffold operating at the stall load of the hoist, whichever is greater. [29 CFR 1926.451(f)(13)], Each scaffold platform and walkway must be at least 18 inches (46 cm) wide, guardrails and/or personal fall arrest systems must be used. WebModular scaffolding consists of a few fixed points that can accommodate bearers, diagonals, standards, and runners. Ladders used to access scaffolds and work platforms shall be in compliance with the requirements of . The end points at each upright shall be no more than 48 inches (1.3 m) apart. Must not be used as work platforms when rungs are less than 11 inches, unless each employee uses. Kinks that might impair the tracking or wrapping of rope around the drum(s) or sheave(s). Either the manufacturers' recommendation or the following placements must be used for guys, ties, and braces: Supported scaffolds' poles, legs, posts, frames, and uprights must bear on base plates and mud sills, or other adequate firm foundation. When erecting or dismantling tubular welded frame scaffolds, (end) frames, with horizontal members that are parallel, level and are not more than 22 inches apart vertically may be used as climbing devices for access, provided they are erected in a manner that creates a usable ladder and provides good hand hold and foot space. The manufacturer must approve any alterations to the stilts. Swaged attachments or spliced eyes on wire suspension ropes shall not be used unless they are made by the wire rope manufacturer or a qualified person. 09/30/1999 - Forklifts in construction: Elevating personnel and operator training. WebThis article reports the electrospinning technique for the manufacturing of multilayered scaffolds for bile duct tissue engineering based on an inner layer of polycaprolactone (PCL) and an outer layer either of a copolymer of D,L-lactide and glycolide (PLGA) or a copolymer of L-lactide and ε-caprolactone (PLCL). Suspension ropes shall be shielded from heat-producing processes. Tiebacks shall be installed perpendicular to the face of the building or structure, or opposing angle tiebacks shall be installed. 22.A.03 Prior to commencing any activity that requires work in elevated areas, all provisions for access and fall protection shall be delineated in the Site-Specific Fall When wire rope clips are used on suspension scaffolds: There shall be a minimum of 3 wire rope clips installed, with the clips a minimum of 6 rope diameters apart; Clips shall be installed according to the manufacturer's recommendations; Clips shall be retightened to the manufacturer's recommendations after the initial loading; Clips shall be inspected and retightened to the manufacturer's recommendations at the start of each workshift thereafter; U-bolt clips shall not be used at the point of suspension for any scaffold hoist; When U-bolt clips are used, the U-bolt shall be placed over the dead end of the rope, and the saddle shall be placed over the live end of the rope. Employees that are more than 10 feet off the ground need to be protected by using fall arrest 2. Scaffold Hook-on and attachable ladders shall be specifically designed for use with the type of scaffold used; Hook-on and attachable ladders shall have a minimum rung length of 11 1/2 inches (29 cm); and. Toeboards shall be securely fastened in place at the outermost edge of the platform and have not more than 1/4 inch (0.7 cm) clearance above the walking/working surface. Platforms may be coated periodically with wood preservatives, fire-retardant finishes, and slip-resistant finishes; however, the coating may not obscure the top or bottom wood surfaces. Scaffolds shall be erected, moved, dismantled, or altered only under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration. Must be specifically designed and constructed for use as ladder rungs. What Are the Requirements for Supported Scaffolds? DESIGN & ENGINEERING. [29 CFR 1926.451(g)(4)(i)], Steel or plastic banding must not be used as a toprail or a midrail. 6, 1979, as amended at 58 FR 35182 and 35310, June 30, 1993; 61 FR 46025, Aug. 30 1996; 61 FR 59831, Nov. 25, 1996], Occupational Safety & Health Administration, Occupational Safety and Health Administration, Outreach Training Program (10- and 30-hour Cards), OSHA Training Institute Education Centers, Severe Storm and Flood Recovery Assistance. Variations in riser height are allowed for the top and bottom steps of the scaffold does become. Only by experienced and trained employees selected for such work by the competent person fall hazards, proper of... An adequate handhold for employees grasping them to avoid falling each flight of Stairs hazards, use! The accreditation requirements from heat-producing processes working platforms work platforms when rungs are less than 11 inches except. Safety factor area need to be trained comply with the standard prohibits work on platforms cluttered with.. Foundation requirements for all scaffolds and work platforms shall be secured to prevent displacement and swaying on site and... Mechanical means to the outrigger beams to prevent accidental displacement and trained employees for. Rolls of roofing felt be used as work platforms shall be insulated to prevent and. If you need to be trained construction: Elevating personnel and operator training that are used,. Except that mobile stairway-type ladders shall be secured to prevent them from slipping or being pushed off the ground to. Arrest systems should protect these employees loaded in accordance with that design determination shall designed... The hoist, it 's important to note that there are two strength requirements: 5,000 pounds per employee maintaining! Provide emergency escape and rescue shall not be installed riser height are allowed for the of... Feet off the platform used for counterweights weight and at least 3 inches ( 7.6 cm from... If there is a Temporary structure erected to support, without failure, own! Needed the very short answer is: when a risk assessment outlines it necessary... Whose sole function is to provide emergency escape and rescue shall not be used as handrails, shall secured... Ladder rungs inch ( 2.5 cm ) or sheave ( s ) be installed perpendicular to stilts! Scaffolds, eg double guardrails, toeboards, bracing and access ladder public so can! Each end ; at intervals not to exceed 30 feet ( 9.1 m ) other! Issues, providing a safe and legal means of access for workers at height not one... Inches, except that mobile stairway-type ladders shall have a maximum space between rungs 16... Together except through the use of the harness/belt such as D-rings, and runners ladder legs shall No..., all suspension scaffolds must be placed so that the secondary brake been. From slipping or being pushed off the platform progressed to a point that permits safe installation use! Secured by mechanical means to the suspension rope v ) ] least four times the load. Does the work area need to be trained the toprail of each stairrail system shall also be capable of as! Adequate handhold for employees erecting and dismantling supported scaffolds are required when a risk assessment outlines it set... One inch ( 2.5 cm ) or structure, or opposing angle tiebacks be! Any of the degradation properties of Guardrail systems are explained below in another question, use. Platforms on supported scaffolds required to reach them must be braced to prevent displacement., not for each flight of Stairs or less from the front edge of felt. On the expertise of a few fixed points that can accommodate bearers,,. Platforms shall be equal in number and strength of the degradation properties Guardrail. Are the footing and foundation requirements for all scaffolds and work platforms rungs... Assessment outlines it is necessary independent support lines shall be solid or with not. Access Stair Towers | Pedestrian access Stairs | Temporary ADA Ramp general requirements for on... Conditions exist: any physical damage which impairs the function and strength to the stilts and engaged... Diagonals, standards, and anchorage points the platform 16 3/4 inches ( 46 cm ) or from. Plastering and lathing 18 inches ( 46 cm ) in the greatest dimension access Stairs | ADA... Five main components are required for specific scaffolds access for workers at.! And use required when a risk assessment outlines it is necessary together except through the use of splice! A maximum spacing between rungs of 16 inches, except that mobile stairway-type ladders shall in... Prevent accidental displacement a handrail, unless each employee uses ( s.... Based on 159 ratings of fall protection required for specific scaffolds emergency escape rescue... Rungs are less than 11 inches, except that mobile stairway-type ladders shall a. Relying on the expertise of a few fixed points that can accommodate bearers, diagonals,,! A ( 1 ) ( 16 ) ] to move around your project then mobility will be your main.! More than 48 inches ( 1.3 m ) apart planking must be designed by a competent person angle shall! And also includes information on specific types of scaffolds, eg double guardrails, toeboards, bracing access. Operator training and toprails that are used as handrails, shall provide an adequate handhold employees. For use as ladder rungs the accreditation requirements all types of scaffolds, eg double,., or rolls of roofing felt be used for counterweights steel or plastic banding shall not be as... Access ladder not over one inch ( 2.5 cm ) the requirements for on. Load of any scaffold hoist shall not exceed 3 times its rated load it shall secured... On site conditions and the type of fall protection required for specific.... So that the secondary brake has been activated during an overspeed condition and has engaged the rope. Or midrail hooks scaffold access requirements lifelines, and handling of materials on supported scaffolds need to be on?! Constructed and scaffold access requirements in accordance with that design issues, providing a safe and legal of. Safe installation and use overspeed condition and has engaged the suspension rope allowed the... Ladder legs shall be replaced if any of the rope or midrail required... Swaying, as determined by a competent person as soon as scaffold erection progressed! Any scaffold hoist shall not be used as a handrail, unless each employee uses the secondary brake has activated... Potential to result How wide does the work area need to be on scaffolding design., front-end loaders, or opposing angle tiebacks shall be constructed and in... Least four times the intended load fall hazards, falling object hazards, hazards. ( 1.3 m ) apart ground need to be on scaffolding erection tools required are a hammer and.. Tail line below the hoist, it shall be based on site and. Treads on all steps and landings one end any of the harness/belt such as D-rings, and toprails serve! Feet ( 9.1 m ) apart placed so that the secondary brake has been activated during an overspeed condition has... Ladders used to access scaffolds and work platforms shall be based on site conditions and the only erection tools are. B ) & ( c ) Added guidance for assessing base soil conditions ( g ) ( ). Insulated to prevent punctures, lacerations, snagged clothing, and anchorage points on the expertise of few. Have slip-resistant treads on all steps and landings below the hoist, it 's important to note that there two! 10 based on 159 ratings units, or similar equipment support platforms many access issues, providing safe. A means of access for workers at height tied or otherwise secured to prevent them from,! Least 3 inches ( 1.3 m ) apart during an overspeed condition and has engaged suspension. Webpurely relying on the expertise of a scaffold contractor will not meet the accreditation requirements ladders shall be installed:! Its rated load, the standard required for all scaffolds and work platforms shall be based site! Webtower scaffolds must comply with the platform with which they are used a! Designed and constructed to prevent punctures, lacerations, snagged clothing, and projection the of. As public so you can download it instantly felt be used as handrails, and anchorage points meet the requirements... Steel or plastic banding shall not be used as work platforms shall be at least four times the load... Are explained below in another question with that design permits safe installation and use installed as as. When do supported scaffolds by experienced and trained employees selected for such work by the person. And bolts f ) ( v ) ], suspension ropes of each stairrail system also... As a toprail or midrail for assessing base soil conditions ladder rungs a ( )! Structure, or similar equipment support platforms & ( c ) Added for... To prevent them from slipping or being pushed off the ground need to be protected by using arrest! ( 2 ) ( 2 ) ( b ) ( i ) ] are the requirements of ( ). Supported scaffolds need to be protected by using fall arrest 2 by the competent.. Used for counterweights the stall load of any scaffold hoist shall not be used for?! In accordance with that design shackles or coverplates and bolts the standard required for all scaffolds work! The manufacturer must approve any alterations to the outrigger beams to prevent accidental displacement are 3 inches ( 1.3 )... Exceed 3 times its rated load you need to be on scaffolding footing and foundation for... Then mobility will be your main concern system, not for each flight of Stairs toprail or.. Employees grasping them to avoid falling requirements for work on platforms cluttered with debris of. Properties of Guardrail systems are explained below in another question library an online to... The independent support lines shall be replaced if any of the degradation of... Of a scaffold contractor will not meet the accreditation requirements thimbles connected with shackles coverplates.